Mountain of Fire Ministries — Kleckley
Project Overview
In south Houston, Epic converted part of a 113,640 SF former K-Mart into a two-story worship space. The work began with a structural steel addition and second-level construction, then ran through the full interior: framing, drywall, tape and float, insulation, acoustical ceilings, and doors and hardware, all held under one contract. The building's convention hall stayed an unfinished shell until 2022, when Epic returned to build it out under a separate engagement.
Services on This Project
- Location
- 10000 Kleckley Dr, Houston TX 77075
- Timeline
- Jan 2016 – Jan 2017
- Building Size
- 113,640 SF
- Floors
- 2
Scope of Work
- Structural steel addition & second-level construction
- Metal stud framing
- Drywall installation
- Tape & float finishing
- Insulation
- Acoustical ceiling installation + doors & hardware
Project Photos
Start Your Next Project
Ready to Build?
Tell us what you're building. We'll talk through scope, schedule, and budget, then give you a straight answer on whether Epic is the right contractor for the job.
Get in Touch
+1 (281) 768-4510 info@epiccontractors.comBonded, insured, and ready to talk, whether you're mid-bid or still in pre-construction.
Contact Us →