Galveston Fire Station
Story
The Galveston Fire Station project involved constructing a resilient facility designed to provide safety and reliability for the community. Epic Contractors was responsible for framing, drywall installation, tape & float, acoustical ceilings, and door and hardware installation, ensuring that the station met the highest standards of durability and functionality.
- Location:823 26th Street Galveston TX 77550
- Scope:Performed complete interior and exterior framing, along with drywall installation to establish a strong foundation. Installed acoustical ceilings and doors with hardware to support the functional needs of the facility.



Challenges
Hurricane-proofing the structure was the primary challenge, requiring precise engineering and the use of heavy-gauge metal materials. Meeting these stringent requirements while maintaining project timelines demanded expertise and attention to detail.
Results
The Galveston Fire Station stands as a robust and reliable facility, equipped to serve first responders and the community during emergencies. Epic’s commitment to excellence ensured that this project was completed to the highest standards.