Galveston Fire Station
Project Overview
Ground-up construction of a ~27,000 SF, 3-story hurricane-resilient fire station on Galveston Island — designed to remain operational through Category 5 conditions and flood events. Scope included interior and exterior metal stud framing in light and heavy gauge, drywall, tape and float, acoustical ceilings, and door and hardware installation across apparatus bays, living quarters, and administrative spaces. Heavy-gauge framing systems, corrosion-resistant materials, and elevated structural performance requirements throughout. Work executed to public safety codes with zero-tolerance compliance standards across all life-safety assemblies.
Services on This Project
- Location
- 823 26th St, Galveston TX 77550
- Timeline
- Oct 2018 – Oct 2019
- Building Size
- ~27,000 SF
- Floors
- 3
Scope of Work
- Interior & exterior metal stud framing (light & heavy gauge)
- Drywall installation
- Tape & float finishing
- Acoustical ceiling installation
- Door & hardware installation
- ~27,000 SF, 3-story hurricane-resilient (Cat 5) station — apparatus bays, living quarters, admin
Project Photos
Start Your Next Project
Ready to Build?
Tell us what you're building. We'll talk through scope, schedule, and budget, then give you a straight answer on whether Epic is the right contractor for the job.
Get in Touch
+1 (281) 768-4510 info@epiccontractors.comBonded, insured, and ready to talk, whether you're mid-bid or still in pre-construction.
Contact Us →