Acoustical Ceilings
Grid installed in full coordination with the trades above — lighting, mechanical, and sprinkler sequenced so your ceiling closes on schedule.
Get in TouchHouston's Commercial Acoustical Ceiling Contractor
Epic installs commercial acoustical ceiling systems built around one principle: we sequence lighting, mechanical, sprinkler, and access-panel locations with your MEP trades before the first grid wire is hung — eliminating the rework that derails ceiling schedules on commercial projects.
Ceilings are the last scope visible in a finished space — grid alignment, level tolerances, and tile condition all reflect on the GC's quality. We deliver laser-level grid lines and matched, undamaged tile at every handoff, no exceptions.
Grid & Tile Systems
- Standard 15/16" exposed tee grid — 2'×2' and 2'×4' module
- 9/16" narrow-profile Tegular grid for high-end commercial and hospitality
- Concealed grid — drywall-integrated and tile-drop
- Specialty tile — mineral fiber, fiberglass, metal pan, wood-look
- High-NRC acoustical tile for conference rooms and open office
- Washable, scrubbable tile for healthcare and food service
MEP Coordination & Specialty
- Pre-installation coordination meeting with MEP + fire suppression
- Light fixture, sprinkler head, and diffuser locations set against grid module
- Access panel placement for above-ceiling serviceability
- BIM/CAD coordination on complex reflected ceiling plans
- Cloud, floating, sloped, and curved ceiling systems
- Fire-rated assemblies to UL and IBC seismic bracing
Why GCs Choose Epic for Ceilings
Industries We Serve in Greater Houston
Office & Commercial
Open office, conference rooms, and executive interiors requiring precision grid alignment.
Hospitality & Hotel
Guest corridors, lobby, banquet, and back-of-house acoustical ceiling systems.
Healthcare
Washable, infection-control ceiling systems for clinical environments.
Retail
Standard and specialty ceiling systems for retail and restaurant environments.
One Contract, the Full Interior Scope
Epic self-performs framing, drywall, acoustical ceilings, insulation, and demolition, with the finish held under one contract. One owner for the full interior assembly, one schedule, one warranty. We control the sequence, so trades hand off clean instead of colliding in the field.
The interior trades, in typical build order
Acoustical Ceilings
Grid, tile, and specialty systems
Commonly bundled with acoustical ceilings
Tenant improvements and full-gut rebuilds in occupied buildings
Multi-location rollouts, built to your store standard
Need more than one trade?
All ServicesFrequently Asked Questions
We hold a pre-installation coordination meeting with your mechanical, electrical, plumbing, and fire suppression trades before grid is touched. Out of that meeting comes a single approved reflected ceiling plan — every fixture, diffuser, sprinkler head, and access panel located against the grid module. Nothing goes in the ceiling that isn't on that plan. Grid doesn't go up until above-ceiling rough-in is signed off.
Yes. We install a range of specialty ceiling systems including narrow-profile Tegular grid, concealed spline systems, metal pan ceilings, cloud ceilings, curved and sloped grid assemblies, and combination drywall-and-tile systems. For proprietary systems, we work directly with the manufacturer's technical representative during installation.
Healthcare environments typically require washable, scrubbable tile that can be cleaned with hospital-grade disinfectants without degrading. We install Humiguard, CleanRoom, and similar moisture and mold-resistant tiles in clinical settings. Tile selection is confirmed with your design team based on the specific clinical requirements of each space.
Yes. All acoustical ceiling systems are installed with IBC-compliant seismic bracing per the structural engineer of record's requirements. Seismic wire spacing and bracing angles are confirmed with your structural engineer before installation begins.
For standard ACT ceiling scopes, we can typically mobilize within 1–2 weeks of contract execution pending material lead times. Specialty tile systems with long manufacturer lead times should be identified early in preconstruction to avoid schedule impacts.
START YOUR NEXT PROJECT
READY TO BUILD?
Tell us what you're building. We'll talk through scope, schedule, and budget, then give you a straight answer on whether Epic is the right contractor for the job.
GET IN TOUCH
281-768-4510 info@epiccontractors.comBonded, insured, and ready to talk, whether you're mid-bid or still in pre-construction.
CONTACT US →