La Marque Fire Station
Project Overview
Ground-up construction of a ~17,000 SF, single-story three-bay fire station — interior and exterior metal stud framing in light and heavy gauge, drywall, tape and float, insulation, acoustical ceilings, and door and hardware installation. Heavy-gauge framing and corrosion-resistant construction required throughout for coastal wind and storm-resilience performance. Scope executed across apparatus bays, living quarters, dormitories, and office and support spaces — multiple finish environments within one structure, all built to municipal code with zero-tolerance life-safety compliance.
Services on This Project
- Location
- 1000 Saltgrass Point Blvd, La Marque TX 77568
- Timeline
- Aug 2017 – Jun 2018
- Building Size
- ~17,000 SF
- Floors
- 1 (single-story, three-bay)
Scope of Work
- Interior & exterior metal stud framing (light & heavy gauge)
- Drywall installation
- Tape & float finishing
- Insulation
- Acoustical ceiling installation + door & hardware installation
- ~17,000 SF single-story three-bay — apparatus bays, living quarters, dormitories, support spaces
Project Photos
Start Your Next Project
Ready to Build?
Tell us what you're building. We'll talk through scope, schedule, and budget, then give you a straight answer on whether Epic is the right contractor for the job.
Get in Touch
+1 (281) 768-4510 info@epiccontractors.comBonded, insured, and ready to talk, whether you're mid-bid or still in pre-construction.
Contact Us →