The Watt — Demolition
Project Overview
Full gut demolition across all 19 floors of a ~420,000 SF office tower ahead of an office-to-residential conversion — interior partitions, ceiling systems, flooring, doors, frames, and millwork removed and disposed floor by floor. Structural frame and vertical shafts maintained throughout. Demolition sequencing coordinated directly with MEP redesign and the framing buildout phases to keep the conversion on schedule.
- Location
- 550 Westlake Park Blvd, Houston TX 77079
- Timeline
- Oct 2023 – Oct 2024
- Building Size
- ~420,000 SF
- Floors
- 19
- Scope Type
- Full Gut Demolition
Scope of Work
- Full gut demolition across all 19 floors
- Interior partitions, ceilings, flooring, doors, frames & millwork removed floor-by-floor
- Structural frame & vertical shafts maintained throughout
- Demolition sequenced with MEP redesign & framing buildout phases
- ~420,000 SF office tower prepped for office-to-residential conversion
Project Photos
Start Your Next Project
Ready to Build?
Tell us what you're building. We'll talk through scope, schedule, and budget, then give you a straight answer on whether Epic is the right contractor for the job.
Get in Touch
+1 (281) 768-4510 info@epiccontractors.comBonded, insured, and ready to talk, whether you're mid-bid or still in pre-construction.
Contact Us →